IDLE FACTORYSTEAMWORKS / LV-01
Not saved
INITIALISING FACTORY CONTROL…
CONSTRUCTION STORAGE

Factory inventory

PROCESS REGISTRY

Factory recipes

16 of 16 registered processes

crushIron

Crush iron ore

2s
1 Iron ore2 Crushed iron

Double ore yield before smelting.

Steam macerator
crushCopper

Crush copper ore

2s
1 Copper ore2 Crushed copper

Prepare copper ore for efficient smelting.

Steam macerator
smeltIron

Smelt iron

2s
1 Crushed iron1 Iron ingot

Refine crushed iron into ingots.

Steam furnace · LV electric furnace
smeltCopper

Smelt copper

2s
1 Crushed copper1 Copper ingot

Refine crushed copper ore into ingots.

Steam furnace · LV electric furnace
smeltSteel

Smelt steel

5s
2 Iron ingot, 1 Coal1 Steel ingot

Carburise iron for LV-grade steel.

Steam furnace · LV electric furnace
pressIron

Press iron plate

1.5s
1 Iron ingot1 Iron plate

Form iron into construction plate.

Steam press
pressCopper

Press copper plate

1.5s
1 Copper ingot1 Copper plate

Form copper into conductive plate.

Steam press
pressSteel

Press steel plate

2.5s
1 Steel ingot1 Steel plate

Form durable LV-grade plate.

Steam press
makeGears

Cut iron gears

2s
2 Iron plate1 Iron gear

Cut a matched mechanical gear.

Steam assembler
drawWire

Draw copper wire

1.5s
1 Copper ingot2 Copper wire

Draw an ingot into two lengths of wire.

Steam wiremill · LV wiremill
makeMotor

Assemble LV motor

4s
2 Steel plate, 2 Iron gear, 6 Copper wire1 LV motor

Wind and assemble a low-voltage motor.

LV assembler
makeCircuit

Assemble LV circuit

4s
2 Copper plate, 8 Copper wire, 1 Steel plate1 LV circuit

Build a robust primitive controller.

LV assembler
makeCasing

Assemble LV casing

4s
6 Steel plate1 LV machine casing

Assemble a sealed machine enclosure.

LV assembler
makeProbeFrame

Build probe frame

6s
2 LV machine casing, 4 Steel plate, 2 LV motor1 Probe frame

Build the probe chassis and control surfaces.

LV assembler
makeGuidance

Build guidance unit

6s
4 LV circuit, 2 LV motor, 8 Copper wire1 Guidance unit

Assemble navigation and telemetry.

LV assembler
assembleProbe

Assemble survey probe

10s
1 Probe frame, 1 Guidance unit, 2 LV machine casing1 Survey probe

Complete the first orbital survey probe.

LV assembler
LOCAL DATA

Factory record

Export a portable save, import one from disk, or begin a clean factory.

FACTORY TOOLING

Engine observatory

Waiting for the simulation worker